← all boards ◆ home
Marketing

Social Media

Content calendar, posts, campaigns, and creative assets.

Start here: the plans & live documents for this area

Six Months to Opening: the Social PlanPre-launch 26-week calendar (blog to social pipeline), strategy, and a living discussion area we shape together and iterate on.Open →Instagram Benchmark & Strategy (the analysis Rory asked for)16 peer Instagram accounts profiled. Graphics-first works (Bathhouse built ~290K on carousels). Local field is under 5k and beatable.Open →Content Library (every blog + every post, copy + download)26 full blog articles and 82 main Instagram posts (201 images), 27 weeks from Sep 28 2026 to Apr 4 2027.Open →Post Gallery (every post rendered, download + copy)All 201 finished 1080px images for the 82 main posts (every carousel slide included), 27 weeks from Sep 28 2026 to Apr 4 2027, with per-image download…Open →Content Studio (review everything + leave feedback here)Every blog, every post with its images, the weekly video and stories, with a feedback box and Looks-good sign-off on each piece.Open →Call Log (every call, every item, tracked)The running record of the biweekly reviews: decisions, owners, and status per item, with open items carried forward.Open →
1 of 9 done · 8 open

Items (9)

OpentaskSOC-02Profile setup (bio, handles, link-in-bio)
details

What: Finalize handles, bios, and the link-in-bio destination.

Note: Handle confirmed: @ritualstudiospa. The bio text and the link-in-bio destination are not confirmed yet.

In progressdocSOC-DOC1Six Months to Opening: the Social Plan
details

What: Pre-launch 26-week calendar (blog to social pipeline), strategy, and a living discussion area we shape together and iterate on.

Link: /reports/social-plan.html

In progressdocSOC-DOC2Instagram Benchmark & Strategy (the analysis Rory asked for)
details

What: 16 peer Instagram accounts profiled. Graphics-first works (Bathhouse built ~290K on carousels). Local field is under 5k and beatable. Scorecard, content pillars, pre-launch and post-launch strategy, 4-week starter calendar, growth tactics.

Link: /reports/social-benchmark.html

In progressdocSOC-DOC3Content Library (every blog + every post, copy + download)
details

What: 26 full blog articles and 82 main Instagram posts (201 images), 27 weeks from Sep 28 2026 to Apr 4 2027. Copy buttons on every blog and caption, download-all-as-markdown, dark/light, Ritual branded, approved taglines and real sources only.

Link: /reports/content-library.html

In progressdocSOC-DOC4Post Gallery (every post rendered, download + copy)
details

What: All 201 finished 1080px images for the 82 main posts (every carousel slide included), 27 weeks from Sep 28 2026 to Apr 4 2027, with per-image download and copy-caption buttons.

Link: /reports/post-gallery/

In progressdocSOC-DOC5Content Studio (review everything + leave feedback here)
details

What: Every blog, every post with its images, the weekly video and stories, with a feedback box and Looks-good sign-off on each piece. The long-term home for content review.

Link: /reports/content-studio.html

In progressdocSOC-DOC6Call Log (every call, every item, tracked)
details

What: The running record of the biweekly reviews: decisions, owners, and status per item, with open items carried forward.

Link: /reports/call-log.html

PartialtaskSOC-03First launch batch of posts
details

What: Design and schedule the opening set of posts.

Note: The opening batch is designed and in the Content Studio. 0 posts approved yet; first post proposed Monday Sep 28.

✓ DonetaskSOC-01Set up content calendar
details

What: Pick cadence and plan the first two weeks of posts.

Note: 27 week calendar built; week 1 proposed for Monday Sep 28, pending Rory's OK on today's call.

Runs / log

2026-09-01
v3 redesign applied (Rory Aug-27 canvas feedback)
Connect slot converted to the weekly Building Ritual / founder Reel across all 27 weeks (shot lists + spoken lines + captions, engagement CTAs only). Waitlist asks verified at max 1 per week (0 weeks over). Calendar reframed as a content bank finalized 2 weeks at a time. Local engagement routine added (2x/month, engagement actions weeks 6-8, collab posts week 10+: CrossFit boxes, PT clinics, run clubs, firefighter community, coffee shops). 3 pinned posts mapped, 5 Highlights (Start here / The build / Experience / Waitlist / FAQs). Measurement plan written (IG Insights + UTM bio link + GA4 events; pending GA4 property access). Instagram primary + Reels crossposted to Facebook. Old Connect graphics kept as backups/story material. WEB-A62 verified genuinely fixed same day.